26/00030/NMAApproveLast updated 24/07/2026, 01:18
A non-material amendment is sought to extend the weatherboarding finish around to the southern gable end at first-floor level in place of the previously approved brickwork.
No change to materials is proposed beyond this substitution.
Non Material Amendment
Main St, Wormington
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Non-Material amendment to planning approval 25/00605/FUL to extend the use of weatherboarding from the rear (Eastern) facade to carry around the Southern gable end ILO brick at first floor level only. No change to the materials used, simply substitution
Application Timeline
Application Registered02/07/2026
Application Validated13/07/2026
Decision Made14/07/2026
Decision Issued14/07/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
Upper-floor or window works
First-floor, dormer, balcony or window works in the description.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.