26/00718/LBCApproveLast updated 02/08/2026, 04:29
Flood mitigation works are proposed on Tower Street, involving structural strengthening of the abutment walls for the Grade II listed Skeldergate Bridge.
The project includes attaching a support post to the western bridge masonry and constructing a free standing supporting wall on the eastern side.
Listed Building Consent
Tower Street, York YO10
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Flood mitigation measures within Tower Street, including strengthening the abutment walls of the Grade II Skeldergate Bridge including the attachment of a support post to the bridge masonry wall on the west side of Tower Street and a free standing supporting wall on the eastern side of Tower Street (variation to Listed Building Consent 22/02491/LBC).
Application Timeline
Application Registered17/04/2026
Application Validated20/04/2026
Decision MadeN/A
Decision Issued31/07/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.