26/01184/LISApproveLast updated 02/08/2026, 04:04
Internal refurbishment and layout reconfiguration works are proposed at the historic Chambers Boarding House, alongside the installation of a new foul drainage connection.
Listed Building
College Street, Winchester SO23
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Internal alterations to refurbish (including the installation of replacement services) and reconfigure the layout of the Old Beer Cellar and Treasury Store at Chambers Boarding House (Grade I buildings) and a new foul drainage connection.
Application Timeline
Application Registered05/06/2026
Application Validated05/06/2026
Decision MadeN/A
Decision Issued31/07/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.
Case Officer
Applicant
Sign in to view name
Winchester College