Proposals involve repair and refurbishment works to the hotel, including repointing of the rear elevation and chimneys, brickwork and timber beam repairs, window replacements, and the installation of cast iron rainwater goods.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
Re-routing of an old rainwater goods pipe. Full repointing works to the rear elevation of the hotel. Replacement of the uPVC rainwater goods with cast iron rainwater goods in black. Replacement of a number of spalled bricks. Propping and removal and replacement of a timber structural beam. Propping, removal and replacement of incorrectly blocked up windows. Removal and replacement with like for like oak sash window. Replacement of stone step internally in the kitchen with matched stone. Repointing of three octagonal chimneys, and brickwork repairs. Installation of coils to prevent water ingress. Redecoration of existing sash windows to be finished to match existing colour.
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.