DC/099776PendingLast updated 09/08/2026, 06:02
The proposal includes a single storey rear extension with decking, a new front porch, and a single storey front extension.
It also involves changing the roof of the existing first floor side extension from a flat roof to a gable roof.
Householder
Cherry Walk, Cheadle SK8
Get notified about the decision
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
Single storey rear extension with decking, new front porch and single storey front extension, and change of roof to the existing first-floor side extension from a flat roof to a gable roof.
Application Timeline
Application Registered20/07/2026
Application Validated28/07/2026
Decision MadeN/A
Decision IssuedN/A
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
Upper-floor or window works
First-floor, dormer, balcony or window works in the description.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.