26/42346/NOTHApproveLast updated 23/07/2026, 11:17
Replacement of 140 metres of overhead open wire conductor with bunched conductor and upgrading of a single pole transformer structure to an H-pole.
Other Notifications
Outwoods, Newport, UK
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Replace 4 spans of open wire conductor with bunched ABC conductor totalling 140m. Upgrading existing single pole mounted transformer pole and two stay wires 85GNDEA9 to a 'H' pole
Application Timeline
Application Registered08/06/2026
Application Validated08/06/2026
Decision Made10/07/2026
Decision Issued10/07/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.
Case Officer
Applicant
National Grid