Skip to content
PL/2026/01177/NONMCApproveLast updated 25/07/2026, 12:42

A non-material amendment is sought for a previously approved solar photovoltaic and battery storage development to alter approved underground cable routes and connection infrastructure.

Non Material Amendment
Holly Lane, Balsall Common

Keep track of this application

Sign in and like this application to get an email when the decision is made.

Full Proposal

Amendments to planning permission 30 January 2025 (following planning appeal APP/Q4625/W/24/3347316 after planning application PL/2023/01952/PPFL) for : Construction, operation and subsequent decommissioning of a renewable energy park comprising ground mounted solar photovoltaics (PV) with co-located Battery Energy Storage System (BESS) at the point of connection, together with associated infrastructure, access, landscaping and cabling (cross boundary application with Warwick District Council). NAMELY : revisions to the approved underground cable routes and associated point of connection infrastructure.

Application Timeline

Application Registered16/06/2026
Application Validated16/06/2026
Decision Made13/07/2026
Decision Issued13/07/2026
Approximate area shownSign in for the exact location

For neighbours

Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
Access or parking changes
The description mentions access, parking or similar.

What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.

Applicant

Sign in to view name
2nd Floor, Coachworks 9-10 Charlotte Mews London W1T 4EF

Agent

2nd Floor, Coachworks 9-10 Charlotte Mews London W1T 4EF 2nd Floor, Coachworks 9-10 Charlotte Mews London W1T 4EF
Sign in to view address

More Information