2026/052/PPFApprove With ConditionsLast updated 09/08/2026, 00:53
Proposals involve the construction of two wind turbines with a maximum blade tip height of 107 metres alongside a substation and associated infrastructure.
Planning Permission Full
A970, Shetland
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
Application Timeline
Application Registered06/03/2026
Application Validated10/03/2026
Decision Made06/08/2026
Decision Issued06/08/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.