Internal and external alterations to a lean-to barn, including floor level changes, the installation of a kitchen, utility, and shower room, and the reinstatement of a cellar entrance.
The works also involve the replacement and addition of conservation rooflights and window modifications.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Internal works to lean to the barn, including. Internal levels changed to ground and first floor. New utility and shower room at first floor and new kitchen and seating area at ground floor. Replacement of existing rooflights with, and creation of additional, conservation rooflights. First floor bathroom window to be moved to accommodate new floor level. A new window is to be inserted at ground floor kitchen. Reinstate the historic entrance to the cellar by removing the stud wall under the stairs.
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.