26/00483/FLPendingLast updated 22/07/2026, 16:22
Installation of a foul drainage system serving Mill Farm, comprising an underground sewage pumping station, a rising main drilled beneath the River Rother, and a public sewer connection.
FULL APPLICATION
Mill Lane, Sheffield S21
Get notified about the decision
Sign in and like this application to get an email when the decision is made.
Full Proposal
The proposed development comprises the installation of a foul drainage system to serve the existing uses at Mill Farm, including a below-ground sewage pump station, a rising main laid via directional drilling beneath the River Rother, and a connection to the Yorkshire Water public sewer network at Station Road, Renishaw. (Conservation Area)(Affecting setting of a listed Building)(Affecting a public right of way)
Application Timeline
Application Registered17/06/2026
Application Validated17/06/2026
Decision MadeN/A
Decision IssuedN/A
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.
Case Officer
Applicant
Renishaw Estates Ltd
Agent
Olamide Adenugba
Sign in to view address