MC/26/1256Approve With ConditionsLast updated 02/08/2026, 00:29
Listed building consent is sought for internal and external refurbishment works at the theatre, involving the installation of a replacement rear lift shaft, permanent structural repairs, and repairs to the roof structure above the ground floor stairs.
Discharge Condition
The Brook, Chatham ME4
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Details pursuant to conditions 6(d) (Details of the replacement rear lift shaft), 15(c) (Details of the permanent repair works) and 15(d) (Details of the repairs to the roof structure for the Ground Floor Stairs) on planning permission MC/24/0336 - Listed Building Consent for the refurbishment and upgrading of Brook Theatre, including structural repairs and fire safety works
Application Timeline
Application Registered01/07/2026
Application Validated01/07/2026
Decision Made29/07/2026
Decision Issued29/07/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.