Consultation from Rossendale BC for the construction and operation of 17 wind turbines, each up to 180 metres high, with associated infrastructure including crane pads, access tracks, substation, electrical cabling, fencing, lighting, drainage, habitat restoration, public right of way works, landscaping, and temporary construction areas, along with improvements to existing access tracks at Scout Moor Wind Farm.
Proposal as recorded
Article 18 consultation from Rossendale BC (ref. 2025/0267): Construction and operation of 17 wind turbines with a maximum height to the tip of the blade of 180 metres (above ordnance datum), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm