26/01241/NT28UnknownLast updated 08/08/2026, 22:28
This proposal involves re-conductoring an existing overhead electrical line to change the voltage capacity from 11,000 volts to 240/415 volts.
Notification (28 days)
March Riverside, Wisbech PE14
Get notified about the decision
Sign in and like this application to get an email when the decision is made.
Full Proposal
EXEMPTED UNDER THE OVERHEAD LINES(EXEMPTION)(ENGLAND AND WALES) REGULATIONS 2009. Re-conductor an existing overhead line from 11,000 volts to 240/415 volts
Application Timeline
Application Registered28/07/2026
Application Validated28/07/2026
Decision Made04/08/2026
Decision Issued04/08/2026
Approximate area shownSign in for the exact location
Case Officer
Applicant
Sign in to view name
UK Power Networks