Internal and external repairs to a Grade II listed building, including the replacement of second-floor floorboards and joists, first-floor ceilings, and a second-floor internal wall.
Works also include repairs to a dormer window, replacement of the bay window roof, and installation of roof ventilation.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
LISTED BUILDING CONSENT: Renewal and replacement of second floor floorboards to facilitate installation of new floor joists. Removal and replacement of first floor ceilings and second floor internal wall. Works to dormer window including repair of rotten timber sections. Installation of replacement of bay window roof and second floor window lintels. Removal and replacement of loft insulation to facilitate roof timber inspection and insect treatment. Installation of roof ventilation (additional/amended information received 18.06.2026, 24.06.2026, 01.07.2026)
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.