DC/25/00760/FULWithdrawnLast updated 22/07/2026, 23:35
Installation of energy infrastructure at Blaydon Leisure and Primary Care Centre, including the drilling of a mine water borehole, air source heat pumps, external pipework, thermal stores, and a reed bed with headwall discharge system.
Full Application
Shibdon Road, Blaydon-on-Tyne
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Proposed drilling of mine water borehole, installation of external pipework, air source heat pumps, thermal stores, and a reed bed with headwall discharge system.
Application Timeline
Application Registered06/08/2025
Application Validated06/11/2025
Decision MadeN/A
Decision Issued02/07/2026