The proposal involves converting the upper floors of the main building and rear annex into three self-contained apartments.
Associated works include roof dormers, rear terraces with fencing, rear extensions, and alterations to pedestrian access.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Change of use of second and third floors of main building and first floor of rear annex from retail storage to 3 self-contained apartments with associated internal and external alterations consisting of: installation of 2 dormers windows to the third floor roof to rear, installation of a door and construction of terraces enclosed with a 2m high fence to rear of second floor of main building, and erection of second floor extension with pitched roof annex at rear to create first floor to apartment, construction of a roof over existing single storey extension to rear to create a private staircase, widening of pedestrian access and installation of double gates following removal of existing single gate
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.