26/1424ApproveLast updated 08/08/2026, 18:27
Approval of details relating to the external materials for the previously approved replacement of combustible facade elements.
The work involves updating the render and spandrel panels to meet higher fire safety standards.
Conditions pursuant to a full permission
Wembley HA0, UK
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Details pursuant to condition 3 (materials) of Full Planning Permission reference 23/2020 dated 7 August, 2023, for Removal and replacement of the combustible elements of the facade. The elements to be replaced are the rendered external wall insulation finish and the large spandrel panels between windows. The proposed facade elements will have a EuroClass A2-s1, d0 combustibility rating.
Application Timeline
Application Registered08/06/2026
Application Validated08/06/2026
Decision MadeN/A
Decision Issued03/08/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
Upper-floor or window works
First-floor, dormer, balcony or window works in the description.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.