26/1394ApproveLast updated 15/08/2026, 18:12
Proposals involve the demolition of a rear boiler store and flue, alongside the replacement of existing timber windows and a door with double-glazed timber units at the rear of the property.
Householder
Barn Hill, Wembley HA9
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
Proposed removal of rear boiler store and flue and replacement of existing single-glazed timber windows and single-glazed timber door with double-glazed timber windows and double-glazed timber door to rear of dwellinghouse
Application Timeline
Application Registered05/06/2026
Application Validated16/06/2026
Decision MadeN/A
Decision Issued11/08/2026
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
Upper-floor or window works
First-floor, dormer, balcony or window works in the description.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.