Installation of a new streetworks pole supporting smart metering antennas, alongside an equipment enclosure and protective concrete bollards.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Prior Approval application for proposed telecommunications code system operators development under Schedule 2, Part 16, Class A of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) - Proposed Arqiva Smart Metering 1no. Omni At 13.45m Mean Mounted On Proposed 12m Streetworks Pole. Proposed Arqiva Smart Metering 1no. 3g Omni Antenna At 4.19m Mean Mounted On Proposed Streetworks Pole. Proposed Arqiva Smart Metering Equipment Enclosure. Proposed Arqiva 4 No. Concrete Bollards
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.