A non-material amendment to a previously approved distillery development, involving layout changes, building size increases, and roof design updates.
The proposal also includes the addition of a courtyard roof, an entrance porch, and modifications to window and door locations.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
Non Material Amendment relatvie to Planning Permission 19/02555/PP - (Erection of distillery with associated maltings and vaulted maturation warehouse, visitor's centre with shop, restaurant and meeting facilities, tasting lodge and associated infrastructure including: sewage treatment plant and pumping station, new junction, access roads, car parking, tankfarms, SuDS pond, reservoir and sea water intake) - The stillhouse has increased by moving east by 3 meters. The Boiler House size has doubled as other functions added to this. The Maltings length increase by around 8 meters and the Kiln area increase, and this has resulted in a 2 Pagoda design to fit the area rather than the 1 as per planning. The Filling store has increase in length to mirror the malting increase in length. The central courtyard has been infilled with a roof to give an internal function space. Entrance porch area added to Office, Visitor area. Some variations on window , door locations. Other variations detailed on submitted drawings.
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.